|
|
OK, so surprise, surprise, its taking a little longer than planned to finish. So rather than keep answering all the emails about "How's it coming" I thought I'd do a status page
I'm also now unemployed and surprisingly finding I have less free time to do development than when I was employed. So yes, not much is getting done recently, sorry
Bail Out Gas Calculator. Allowing for multiple stops and multiple gas mixes. Very useful
Now extended to have different SACs at depth and on stops and to have more stops allowed (Thanks to Dave Thompson fr wantong that)
DDPlan Windows Front End. DDPlan is very popular and easy to use. However it is DOS based and many folks want more output formatting option. This is a major project and turning out to be fun!!!
Licence key encryption and registration (started 6/10/02). This will allow a 30 day trial period, which can be unlocked when you register. This will allow me to provide a web based download and well as a proper CD version
Stickers and marketing material. Mk1 trials last week (4/10/02) were a total failure. Design looked good, but sticker 1 failed to stay on yellow case and sticker design 2 lost all its ink during the first dive. The design is fine but need better materials and adhesive
User Documentation and on line help
Some Reference sections (History etc)
Still need to obtain some permissions and copyright issues to sort
More options on the Simulator
Clean and tidy up, polish a few corners etc
|
|