Birchenwood Colliery No 4 pit
No 4 pit was worked from the mid 19th century until 1931. The large building
to the left of centre housed a massive " Goliath Cornish Pumping Engine"
which had a 6 ft 6 ins diameter cylinder and produced a stroke of 8 ft 6
ins. The other building right of centre was the Engine Pump House.