The demolition of Alloa Brewery was carried
out in the second half of 2001 for Carlsberg Tetley Brewing Ltd.
It involved the full demolition of all buildings on site and the infilling
of basements.
We did offer to dispose of the Lager stock
within the tanks but, unfortunately, that had all been removed before we
arrived on site.
Many of the buildings required the use of our high reach excavator to reduce to ground level. On this occasion we used our Case 9046 with a Kocurek quick fit high reach extension and shear/muncher attachments.

One building and a chimney, both close to the perimeter, required to be demolished by explosive means to enable us to accurately predict the direction of collapse.

The full site was levelled using demolition brick/concrete processed through our Rockranger Crusher.