2009

Work continued on the construction of a new level crossing that will enable the cycle-path, on the old Lee Moor Tramway trackbed, to cross our line as we relay it towards Plym Bridge.

It is almost in the same place where the original crossing over the tramway was.  We are using Holdfast decking and have manufactured are own gates and posts.  The crossing is expected to by finished by the summer.


Go to Top

Back to Projects and Latest News page.

approaches to Lee Moor Crossing
Ballasting the track up to
  Lee Moor Crossing, January 2009.
 Lee Moor Crossing
The first gate is being hung on the post.
January 2009.
Lee Moor Crossing
The second post is carefully positioned before being concreted in.
Lee Moor Crossing and Tamper
A Plasser & Theurer Tamper has been hired in to sort the line out. March .
Lee Moor Crossing ramp
The east side ramp up to the crossing has been finished and fencing is progressing.
Lee Moor Crossing
Lee Moor Crossing has been opened for use and the first track panel north of it is being built. May.