
above -
Lift motors and controls. The lifts were the fastest moving in London.
right -
Main power input circuit breaker. The power was supplied by the St. Marylebone Borough
Council on six separate feeders (3-phase), three at high-tension 6,600 volts, and three
at 240 volts between each phase and neutral. |
|

above -
A corner of the boiler room, showing hot water circulating pumps, hot water storage tank
and calorifier.
top left -
A detail of one of the hot water domestic supply pumps.
|